Our engineers have vast experience in a variety of industries and work in the field
alongside installers, operators and project managers to ensure you receive the best
possible solution. All our systems undergo a factory acceptance test prior to shipping
and intensive site acceptance testing, including:
- Drive Configuration
- PLC Firmware and Programming
- Servo Set-Up
- Instrumentation Calibration
- Vision Systems
- Factory Automation
- Process Controls
Once your panel is built and tested with our thorough QA/QC evaluation, Wesa Automation engineers will commission your system.
VERIFYING INPUTS AND OUTPUTS
We examine the electrical diagram and verify input/output points, including all
communications and analog signals.
LOADING THE PROGRAM
We verify the logic is correct on your program by systematically testing the
subsystems.
CONFIRMING SYSTEM INTEGRATION
We ensure all parts of your system are working together before hand-off.